Presented by: Yunir Gataullin CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, 2004 Guided by: Local guide: K.K.

Презентация:



Advertisements
Похожие презентации
Presented by: Yunir Gataullin CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, 2004 Guided by: Local guide: K.K.
Advertisements

PRELIMINARY DESIGN of new antenna for NOAA AVHRR data reception station in Uzbekistan and IMPLEMENTATION plan for NOAA earth station. CSSTEAP, SATCOM-IV.
ANTENNAS ANTENNAS By Yunir V. Gataullin, junior research assistant, B.Eng, Tashkent Scientific Research Institute of Space Engineering CSSTEAP Fourth Postgraduate.
>> Presentation scapacs401>> Page: 1 >> scapacs401 Modular System For Laser Processing Heads.
VMM (Vector-matrix Multiplication). Electro Optics Modules Long VCSEL array mounted with appropriate Lens array independently controlled by 125 MHz, 9.
,, Work better in near space Advantage – find a global minimum in near space. Nelder-Mead base technique on Rosenbrock function. 1 min 40 sec to solve.
Copyright by Hyundai Motor Company. All rights reserved. EHPS.
© 2005 Cisco Systems, Inc. All rights reserved.INTRO v Connecting to Remote Networks Using Circuit Switching in WANs.
Основные измерения анализатором спектра Методика измерений.
CM ESP/ESC (Bosch 8). 2 Variation Line-up (BOSCH 8 ABS/ESP) S: Standard, O: Option.
© 2006 Cisco Systems, Inc. All rights reserved. HIPS v Module Summary Application Deployment Investigation is a data collection and behavior analysis.
© 2007 Cisco Systems, Inc. All rights reserved.DESGN v Designing Basic Enterprise Campus Networks Describing Campus Design Considerations.
6.1 Chapter 6 Bandwidth Utilization: Multiplexing and Spreading Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
© 2009 Avaya Inc. All rights reserved.1 Chapter Nine, Voic Pro in SCN Module Two – Centralized Voic Pro.
E-LPS Project Team Structure. BS Software Consists of: DSP board system SW DSP board system SW Application SW – pseudo-distance measurement Application.
Trigger – scintillation counters S1-S Trigger conditions: S1 – to choose a narrow (0.1 mm or less) beam fraction.
EHPS Centennial / Equus Copyright 2009 All rights reserved. No part of this material may be reproduced, stored in any retrieval system or transmitted in.
Designing Network Management Services © 2004 Cisco Systems, Inc. All rights reserved. Designing the Network Management Architecture ARCH v
© 2004 Cisco Systems, Inc. All rights reserved. ARCH v Module Summary An enterprise requires its network to be highly available to ensure that its.
Infrared Light Infrared Light Electromagnetic waves whose frequency range is above that of microwaves, but below that of the visible spectrum. Electromagnetic.
Транксрипт:

Presented by: Yunir Gataullin CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, 2004 Guided by: Local guide: K.K. Sood Country guide: Botir Usmonov

CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, operational since mid orbital periods of 98 to 102 minutes - circular sun-synchronous orbits to 800 kilometers altitude - minimum lifetime is 2 years

CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, 2004

CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, 2004 AVHRR (Advanced Very High Resolution Radiometer) Fig. 4 Schematic diagram of the AVHRR scan mirror and telescope ROTATION SCAN MIRROR Secondary Mirror Primary Mirror To optics and detectors Spacecraft velocity vector cm 5.06 cm Signal Dimensions Scanning and reflecting surfaces FROM EARTH

NOAA HIGH RESOLUTION PICTURE TRANSMISION CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, data from all spacecraft instruments - data rate of 665,4 kbps or MHz and MHz - 38 dBm transmission power - RHCP - 5 channels, 6 available

LINK ANALYSIS CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, signal attenuation - required Signal to Noise Ration - required BER (Bit Error Ratio) - receiver G/T (Figure of Merit) - etc……..

HELICAL ARRAY DESIGN CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, easier design - tracking can be done manually - low weight - less space required - cost effective

EARTH STATION INTEGRATION PLAN CSSTEAP, SATCOM-IV SPACE APPLICATIONS CENTER, AHMEDABAD, INDIA August 1, 2003 – April 31, 2004 LNADown Converter Receiver Decoder PC Figure NOAA reception block-diagramm Antenna Control Unit