1 www.aes.com Dushanbe Dilshod Ismatulloev AES Corporation.

Презентация:



Advertisements
Похожие презентации
Kazakhstan Electricity Grid Operating Company KEGOC By Nigmetullina Guldana 301 group.
Advertisements

Definition of units in the statistical register of Rosstat Deputy Head of Department Elena Zarubina.
Labour Migration Flows from Kyrgyzstan to Russia: States´ Cooperation in Migration Policy Cholpon KEMELOVA, The Academy of Public Administration Bishkek,
IP Transit via Russia: TTK Growing Capabilities Caspian Telecoms 2012, Istanbul, Turkey, 19 th April 2012 Konstantin Novikov Wholesale, CIS countries.
Project Development & Business Model. 6 phases of project management.
M.K. Ammosova North –Eastern federal university.
Results of discussion on methodological issues on reporting progress towards the MDGs (Russian Federation) Подготовлено в Центре компьютерного просвещения.
Образец заголовка Образец текста Второй уровень Третий уровень Четвертый уровень Пятый уровень 1 Investment Attractiveness Index with the support of the.
1 Admission Procedure to Anonymous Trading on the RTS Classic Market Natalia Slobodchikova RTS Stock Exchange, NP Miscow, 14 th of October 2005.
© 2005 Cisco Systems, Inc. All rights reserved.INTRO v Constructing Network Addresses Calculating Subnet Masks.
YEREVAN STATE UNIVERSITY OF ARCHITECTURE AND CONSTRUCTION PROGRESS REPORT OF Curriculum Development For Real Estate Master Degree Joint Project Supported.
Project Management: the Basics Why the projects are so popular today? What kinds of projects do we know? What are the main phases of the project? How can.
I chose specialty of radio engineering, electronics and telecommunications.
Logistic Management of investment-construction project TRANSMARKET GROUP.
GLOBAL PERSPECTIVES and PROJECT WORKIntro to GP teacher: Bidanov Olzhas Dzhakhibovich (Mr. Olzhas) GLOBAL PERSPECTIVES and PROJECT WORK.
Foreign languages in my life. 1.English language can help me to achieve future success in my life. 2.It gives me different possibilities. 3.English helps.
Innovation Strategy Management Lecture 7. Programme Part 1 – The basis of Innovation Part 1 – The basis of Innovation Part 2 – Innovation and New Product.
Federal State Educational Institution of Higher Professional Education "Moscow State Construction University" MASTER'S DISSERTATION THEME: Improving methodological.
Innovation Strategy Management Lecture 11. Programme Part 1 – The basis of Innovation Part 1 – The basis of Innovation Part 2 – Innovation and New Product.
Kristin Blom Кристин Блом Campaigns Officer Специалист по организации кампаний International Trade Union Confederation Международная конфедерация.
Транксрипт:

1 Dushanbe Dilshod Ismatulloev AES Corporation

2 AES Corporation в цифрах ENGLISH TEXT ON TAJIKISTAN SECTION Выручка за 2005 составила $11 миллиардов Представлена в 26 странах мира 123 Генерирующих предприятий по всему миру 44,000 MВт. Мощностей Обеспечивает 100 млн. людей энергией 30,000 рабочих мест по всему миру

3 Северная Америка 25% Карибский бассейн 19% Южная Америка 49% Европа/Африка 11% Азия 6% Продажи AES Corporation по географическому признаку

4 Северная Америка США, Канада 26 Генерирующих предприятий 450,000 Клиентов 13,000 MW Общая установленная мощность

5 Карибский бассейн Мексика, Пуэрто Рико, Венесуэла, Доминиканская республика, Колумбия, Сальвадор и Панама 19 Генерирующих предприятий 2,255,000 Клиентов 6,000 MW Общая установленная мощность

6 Южная Америка Бразилия, Аргентина, Чили 36 Генерирующих предприятий 4 Распределительных предприятий 6,729,000 Клиентов 9,000 MW Общая установленная мощность

7 Европа/Африка Великобритания, Ирландия, Чехия, Венгрия, Украина, Камерун, Нигерия 12 Генерирующих предприятий 3 Распределительных предприятий 1,719,000 Клиентов 4,000 MW Общая установленная мощность

8 Азия Китай, Индия, Пакистан, Оман, Катар, Казахстан и Шри Ланка 19 Генерирующих предприятий 2 Распределительного предприятия 460,000 Клиентов 12,000 MW Общая установленная мощность

Main dates 2005 – AES conducts active negotiations with the Government of Tajikistan on the development of the power sector of Tajikistan January 16,2006 – AES joins International Hydropower Consortium of Tajikistan May 24,2006 – Memorandum of Understanding signed between the Government of the Republic of Tajikistan and AES

Heartland Power Project Phase 1 - period Export of seasonally available electric power from Tajikistan to Afghanistan Phase 2 - period Export of electric power to Afghanistan and Pakistan from Kazakhstan and Kirgizstan through Tajikistan Phase 3 – period 2012 & on Construction of one or more hydropower stations with the total capacity of 300 – 1000MWt

Phase 1 Export of seasonally available electric power from Tajikistan to Afghanistan Export of seasonally available electric power from Tajikistan to Afghanistan Construction & rehabilitation of the existing transmission line of 220 KWt from substation to the border with Afghanistan Construction & rehabilitation of the existing transmission line of 220 KWt from substation to the border with Afghanistan The lines length is about 90 km The lines length is about 90 km Approximate cost of the project is US$ 40 million. Approximate cost of the project is US$ 40 million. Sources of funding of the project – credits of Asian Development Bank (ADB) and US Government Sources of funding of the project – credits of Asian Development Bank (ADB) and US Government

Construction of new lines. Phase 1 DesignationVoltage KW Length KM Percent of total length PHASE 1 Tajikistan VATZ - Geran – Sherhan Bandar Total (Phase 1) 90100

Фаза 2 Export of electric power from Kazakhstan and Kyrgyzstan through Tajikistan to Afghanistan and Pakistan Export of electric power from Kazakhstan and Kyrgyzstan through Tajikistan to Afghanistan and Pakistan Construction and rehabilitation of electric power transmission line of the total length of 1575 km Construction and rehabilitation of electric power transmission line of the total length of 1575 km Transmission line route will go through Rogun – Sangtuda – Kunduz – Puli Khumri – Kabul - Peshavar Transmission line route will go through Rogun – Sangtuda – Kunduz – Puli Khumri – Kabul - Peshavar The project cost is at the stage of determination The project cost is at the stage of determination Sources of funding – AES, US Government and other sources Sources of funding – AES, US Government and other sources

Phase 3 Construction of one or more hydropower stations with the total capacity from 300 to 1000 MWt Construction of one or more hydropower stations with the total capacity from 300 to 1000 MWt The project cost is at the stage of determination The project cost is at the stage of determination Sources of funding – AES, US Government and other sources Sources of funding – AES, US Government and other sources

Construction of new lines Phase 2 & 3 DesignationVoltage KW Length KM Percent of the total length PHASE 2 & 3 Tajikistan Khujand - Regar Nurek - Sangtuda Sangtuda 1 – Sherhan Bandar Kyrgyzstan Toktogul - Datka 153 Datka - Khujand Afghanistan Sherhan Bandar – Puli Khumri Puli Khumri - Kabul Kabul – Jelalabad 9017 Jelalabad – Pakistan border 8015 Pakistan Afghanistan border - Peshavar Total (Phase 2 & 3)

Main Objectives Assessment of legislative & normative basis of the project member countries Assessment of legislative & normative basis of the project member countries Marketing survey on demand in electric power in Afghanistan and Pakistan Marketing survey on demand in electric power in Afghanistan and Pakistan Development of agreements on procurement and selling of electric power Development of agreements on procurement and selling of electric power Research on condition of proposed construction sites Research on condition of proposed construction sites Identification of the requirements of International Financial Institutions Identification of the requirements of International Financial Institutions Identification of the organizational structure and agreements on ownership rights Identification of the organizational structure and agreements on ownership rights Preliminary analysis of environmental impact Preliminary analysis of environmental impact Drawing up and estimation and economic analysis Drawing up and estimation and economic analysis

Expected Results Memorandum of understanding is signed between the Government of Tajikistan and AES Memorandum of understanding is signed between the Government of Tajikistan and AES Memorandum of Understanding is signed between SSHC Barqi Tojik and AES on cooperation in the sphere of electric power transmission Memorandum of Understanding is signed between SSHC Barqi Tojik and AES on cooperation in the sphere of electric power transmission Agreement between the Ministry of Energy and AES signed on preparation of feasibility study through the US Government funding Agreement between the Ministry of Energy and AES signed on preparation of feasibility study through the US Government funding Representation of the AES is registered in Tajikistan Representation of the AES is registered in Tajikistan Technical & commercial specialists of the Ministry of Energy, SSHC Barqi Tojik and AES are engaged into operations Technical & commercial specialists of the Ministry of Energy, SSHC Barqi Tojik and AES are engaged into operations Feasibility study for the project on construction of the transmission line is prepared Feasibility study for the project on construction of the transmission line is prepared

Thank you! Contact: Dilshpd Ismatulloev AES Project Manager In Tajikistan Тел: