Www.sy-corp.ru / 678960, Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ»

Презентация:



Advertisements
Похожие презентации
Strategy Project operator * Sakhalin Energy Investment Company Ltd. (Sakhalin Energy) is the Sakhalin II project operator. * The Sakhalin Energy shareholders.
Advertisements

ECONOMY OF SWEDEN. Sweden - a highly industrialized country with intensive agriculture in terms of quality of life is one of the first places in the world.
Labour force – million CHINAS LABOUR FORCE Total – million Unemployment Rate – 4.3 % ( 39 worldwide ) Including migrants – up to 9 % For.
EU TACIS PROJECT Support and Development of Renewable Sources of Energy (Biomass) Objective Promote the use of biomass in Ukraine Veli-Pekka Heiskanen,
M.K. Ammosova North –Eastern federal university.
VOLOGDA OBLAST GOVERNMENT :: DEPARTMENT OF ECONOMICS VOLOGDA OBLAST Project - Industrial park Sheksna"
Map of Kazakhstan Territory: Territory: 2,7 mln. sq. km. 2,7 mln. sq. km. Population: Population: 16 mln. 16 mln. Religions: Religions: 65%- Muslims, 30%-
Образец заголовка Образец текста Второй уровень Третий уровень Четвертый уровень Пятый уровень 1 Investment Attractiveness Index with the support of the.
Ministry for Economy and Trade of KBR State support of investors in Kabardino-Balkar Republic Property tax vacation; Discount of the profitability tax;
Asia Pacific Economic Cooperation (APEC). Countries - Participants AUSTRALIA BRUNEI DARUSSALUM CANADA CHILE CHINA HONG KONG CHINA INDONESIA JAPAN The.
"Proposals on development of a system of regional support for emission inventory preparation and reporting for countries of Eastern Dimension under the.
RUSSIAN STEEL COMPANY, WHICH INCLUDES THE THIRD LARGEST STEEL PLANT IN THE COUNTRY. FULL NAME IS OPEN JOINT STOCK COMPANY "NOVOLIPETSK STEEL". THE PLANT.
By Alyssa Epstein Индустриализация в России Stalin gains total control over Russia Period of large scale industrialization Inherits New Economic.
Oil Companies: World and Russia
1 Almaty Region Region is located in the south-east of the country. As of January 1, 2012 the area is 224 thousand square kilometers, the region's population.
NTC Gidrol-Krovlja ©, Moscow, Russia, 2008 THE RUSSIAN MARKET FOR ROOFING AND WATERPROOFING MATERIALS: WHAT LIES AHEAD?
Taxes in the USA. To tax is to impose a financial charge upon a taxpayer by state. Failure to pay is punishable by law. Taxes consist of direct tax (income.
Created: Koroleva Alina Lopatko Larisa Tutor: Solodilova V.N., the teacher of English.
Branding What is branding? Branding is "modern cultural language of the modern society basing on the market relations" Branding is the main way of differentiation.
Прежде, чем решить Main Economic Indicators of Kazakhstan.
Транксрипт:

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 1

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» THE PROJECT AIMS The investment project Complex Development of South Yakutia aims at creating a new large industrial district in Russia's Far East on the basis of hydroenergy mineral resources available in the region - natural gas, apatites, coal, iron and uranium ores and others. 2

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 3 ECONOMIC CONDITIONS AND POTENTIAL Niche specialization in gold and coal mining Underdeveloped processing industries Low investment growth rates Outflow of population Underdeveloped infrastructure – above all, in energy and transport Largest infrastructural hub in Russias Far East (oil and gas pipelines, railroads and motorways, electric grids) Creating an industrial cluster for high-level processing of mineral resources: – hydropower industry, – uranium production, – gas chemical industry, – iron-ore production, – mineral fertilizers, – coking concentrate. CURRENT STATETHE POTENTIAL OF CREATING A NEW DIVERSIFIED INDUSTRIAL DISTRICT Southern Yakutia is a region with narrowly specialized economy but rich mineral resources and high industrial potential whose realization is stalled by the dearth of transport and energy infrastructure.

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» THE CONSTRUCTION FACILITIES Kankunskaya HEPP; Elkonsky Mining and Metallurgical Complex; Taezhny and Tarynnakhsky Mining and Processing Integrated Works integrated into the South Yakutia Mining and Smelting Association; Inaglinsky Coal Complex; Seligdarsky Mining and Chemical Complex; Yakut Gas Processing and Chemical Combine; Aldansky Factory of Motor Fuels; Transport infrastructure; Power supply infrastructure. 4 The construction of the following facilities is planned within the framework of this project:

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 5 PARTNERSHIP SCHEME The Investment Fund of Russia KANKUNSKAYA HEPP; ELKONSKY MMC; SOUTH YAKUTIA MINING AND SMELTING ASSOCIATION; IINAGLINSKY COAL COMPLEX; SELIGDARSKY MCC; YAKUT GPCC; ALDANSKY FMF.

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 6 PROJECT PARTICIPANTS INITIATOR OF APPLYING TO INVESTMENT FUND OF RUSSIA, PROJECT COORDINATOR : PROJECT INVESTORS: EXECUTIVES IN CHARGE: STATE COORDINATOR: The Government of Sakha (Yakutia) The Investment Fund of Russia MINISTRY OF ENERGY (RUSSIA) FEDERAL AGENCY OF RAIL TRANSPORT ROSATOM FEDERAL HIGHWAY AGENCY MINISTRY OF REGIONAL DEVELOPMENT

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» ON SOUTH YAKUTIA DEVELOPMENT CORPORATION The Corporation was established in April 2007 for submitting a request to the RF Investment Fund and further promotion of the Project. Organizes interaction between all participants of the Project; Coordinates the efforts of state and business during the Project implementation; Ensures the formation of favorable public opinion about the Project; Organizes the alignment of works on the Project. 7

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 8 SHAREHOLDERS The Government of Sakha (Yakutia) RusHydro Joint Stock Company ARMZ Uranium holding Co. ALROSA Investment group Kolmar LTD

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 9 LOCATION

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» FIRST STAGE: DESIGN DEVELOPMENT OF DESIGN DOCUMENTS FOR INDUSTRIAL AND INFRASTRUCTURAL FACILITIES, PASSING ESSENTIAL EXPERT EXAMINATIONS 10 SECOND STAGE: CONSTRUCTION CREATING INFRASTRUCTURAL FACILITIES AT THE EXPENSE OF THE INVESTMENT FUND OF THE RUSSIAN FEDERATION, CREATING MANUFACTURING FACILITIES ON PRIVATE EQUITY FUNDS

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» PROJECT COST PUBLIC INVESTMENTS 114,49 billion rubles Kankunskaya HEPP ( design documents and dam ); Elkonsky MMC ( design documents ); Highways; Railroads; Power supply infrastructure. PRIVATE EQUITY 307,98 billion rubles Kankunskaya HEPP; Elkonsky Mining and Metallurgical Complex; Seligdarsky Mining and Chemical Complex; Taezhny Mining and Processing; Tarynnakhsky Mining and Processing; Inaglinsky Coal Complex; Yakut Gas Processing and Chemical Combine;; Aldansky Factory of Motor Fuels. 11 The Investment Fund of Russia 422,5 billion rubles Every ruble invested by the state in Projects infrastructure attracts three rubles of private equity to the economy.

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 12 KANKUNSKAYA HEPP Lies on Timpton River Dams maximum effective height – 230 m Planned capacity – 1,200 MW Long-term average power generation – 4.87 billion KW/year Construction time – about 8 years (2012–2019) Project investor: ОАО RusHydro (ОАО South Yakutia Hydropower Complex)

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 13 ELKONSKY MINING AND METALLURGICAL COMPLEX Project investor: Uranium Holding « ARMZ» The Elkon, Elkon Plateau, Kurung, Neprokhodimoe, Druzhnoe, Severnoe deposits and the Interesnaya Zone are located in the Aldan district of the Republic of Sakha (Yakutia). Mining of coracite (uranium ore), its processing and dressing, production of up to 5,000 tons of natural uranium oxide concentrate per year

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 14 SOUTH YAKUTIA MINING AND SMELTING ASSOCIATION Project investor: Investment Group «ALROSA» Construction of two mining and concentrating mills based on iron ore deposits – Taezhny and Tarrynnakhsky TAEZHNY MCM Overall output – 9 million of crude ore per year Planned capacity – 4.1 million tons of concentrate per year with the iron content of 67.7% TARYNNAKHSKY MCM With the volume of extraction at 23 million tons of ore per year the planned capacity is about 7.3 million tons of concentrate with the iron content of 68.5% to be further refined into 6.8 million tons of iron nuggets.

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 15 SELIGDARSKY MINING AND CHEMICAL COMPLEX The Selgdarsky Mining and Chemical Complex includes: a mining and concentrating mill – an opencast and a concentrating mill for the production of apatite concentrate; a chemical plant putting out compound phosphor- magnesium fertilizers with manufacturing capacity in excess of 567,000 tons per year. Project investor: Investment Group «ALROSA»

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 16 INAGLINSKY COAL COMPLEX Project investor: Kolmar Construction of the Inaglinskaya mine with planned capacity of up to 2.5 million tons of run-of-mine coal per year and the coal-preparation plant Inaglinskaya to refine run-of-mine coal into coking concentrate; By 2011, the output of cocking concentrate will exceed 1.9 million tons.

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 17 YAKUT GAS PROCESSING AND CHEMICAL COMBINE Project investor: Gazprom Gas will be transported from Chayandinsky oil and gas condensate field over the gas main Yakutia – Khabarovsk – Vladivostok to be built by OAO Gazprom within the framework of its Eastern Gas Program. The output of the Yakut natural gas conversion plant may reach 20 billion cu. m/year. Produce: methane, liquefied helium, polypropylene, polyethylene, butane, C5+ faction (stable gasoline).

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 18 ALDANSKY FACTORY OF MOTOR FUELS Feedstock – treated natural gas from the Chayandinsky field Annual conversion – up to 1.32 billion cu. m of gas and production of more than 560,000 tons of motor fuels (diesel and gasoline) Diesel fuel will account for 64% of the total output and gasoline – for 36%. Project investor: Gazprom

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 19 TRANSPORT INFRASTRUCTURE Design and construction of motorways with total extension nearing 150 km: Tommot – the Elkonsky Mining and Metallurgical Integrated Works (44 km); Maly Nimnyr – power site of the Kankunskaya HPP (106 km) Construction of railways with total extension nearing 270 km: Tommot – Elkonsky MMIW (53 km); Kosarevsky – Seligdarsky MCC (13 km); Taezhnaya – Taezhny MCM (4 km); Chulbas – Inaglinsky Coal Complex (11 km); Ikabyekan – Tarynnakhsky MCM (189 km). Agencies in charge: Federal Roads Agency, Federal Railway Transport Agency FEDERAL AGENCY OF RAIL TRANSPORT FEDERAL HIGHWAY AGENCY

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 20 ARRANGEMENT OF TRANSPORT INFRASTRUCTURE Tarynnakhsky MPIW Taezhny MPIW Kankunskaya HEPP

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 21 ELECTRIC GRID INFRASTRUCTURE The design and construction of infrastructural facilities will be financed from the RF Investment Fund. Coordinator: Russian Ministry of Energy About 1,200 km of high voltage lines Scheme of power distribution at Kankunskaya HEPP: HV lines at 500 KW: Kankunskaya HEPP – Neryungri (246 km), Neryungri substation; HV lines at 500 KW: Kankunskaya HEPP – Aldan (220 km), Aldan substation. Industrial power supply for: Taezhny MPIW (HV lines at 220 KW 6.6 km plus a substation); Seligdarsky MCC (HV lines at 220 KW 7.5 km plus a substation); Inaglinsky CC (HV lines at 110 KW 7.5 km plus a substation); Elkonsky MMIW (HV lines at 220 KW 76 km plus a substation); Tarynnakhsky MPIW (HV lines at 220 KW 203 km plus a substation and second-circuit catenaries at BAM Trans-Siberian Railroad 434 km). The Investment Fund of Russia MINISTRY OF ENERGY (RUSSIA)

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 22 PATTERN ELECTRONETWORK INFRASTRUCTURE for Tarynnakhsky MPIW for Taezhny MPIW Kankunskaya HEPP -

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 23 PROJECT PARAMETERS AND EFFECTS (scenario set for 2007) Profitability of Investment for the Budget (PIB) – 8.96; Profitability of Investment for GDP (PIGDP) – 4.1; Internal Rate of Return (IRR) for the government – 17.4%; Sales revenues (2019) – 273 billion rubles; Net annual gain (2019) – 48.8 billion rubles; Assignments to the federal budget (2019) – 32.9 billion rubles; Assignments to the regional budget (2019) – 15.1 billion rubles; Gross regional product to increase 2.5 times by 2020

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 24 PROJECT EFFECTS Accelerating the pace of socio-economic development in eastern parts of Russia; Reinforcement of Russias geopolitical positions in Southeast Asia due to more intense export flows of Russia-made products and diversification of Russian export, among other factors; High-level processing of extracted minerals at new modern-day manufacturing facilities; Development of the construction industry in the region, including road-building and manufacture of construction materials; Attraction of more than 30,000 workers to Yakutia – one of the most thinly populated subjects in the Russian Federation.

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 25 MAIN EVENTS / June 2007 June 9, 2007 November 16, 2007 January 17, 2008 September 20, 2008 October 10, 2008 South Yakutia Development Corporation applies to the RF Investment Fund for public support. The Investment Commission approves of the application (protocol #7 from June 9, 2007) The request is approved by the Government Commission (protocol #7 from Nov. 16, 2007) Decree #21 of the Russian Government is issued on financing of the Projects first phase from the RF Investment Fund – namely the development of design documents Second approval of the Project by the Investment Commission (protocol #12 from Sept. 20, 2008). Endorsement of the concept and approval of the Project Passport by the Government Commission (protocol #11 from Oct. 10, 2008).

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 26 MAIN EVENTS / March 10, 2009 June 5, 2009 June - October, 2009 September - December, 2009 From January 2010 Decree #302 of the Russian Government on authorization of the Project and financing of design works from the RF Investment Fund. An investment agreement on realization of the Projects first phase is signed. Allocations from the RF Investment Fund are obtained for designing in 2009 of the Elkonsky MMIW, Kankunskaya HEPP, railways, motorways and electric grid infrastructure amounting to the total of 5,372.4 million rubles. Holding tenders for the selection of design corporations, forming the projects design and financing schedule for The design of infrastructural facilities for the Elkonsky MMIW and Kankunskaya HEPP at the expense of the RF Investment Fund; designing of the South South Yakutia Mining and Smelting Association and construction of the Inaglinsky Coal Complex at the expense of investors.

/ , Россия, Республика Саха (Якутия), г.Нерюнгри, пр.Дружбы Народов, д.21 ИНВЕСТИЦИОННЫЙ ПРОЕКТ «КОМПЛЕКСНОЕ РАЗВИТИЕ ЮЖНОЙ ЯКУТИИ» 27 THANK YOU!