Скачать презентацию
Идет загрузка презентации. Пожалуйста, подождите
Презентация была опубликована 10 лет назад пользователемКсения Шаповалова
1 Railway (team 3)
2 Olga Krupennikova Olga Krupennikova (Coordinator,232) Artur Bashlykov (Systems architect,212)Artur Bashlykov List of team members: Vitaly Velyamidov(Domain expert,231)Vitaly Velyamidov Sergey Turkov Sergey Turkov (Quality assurance engineer,209) Sergey Volik (Subsystems architect,531)Sergey Volik
3 Railway Our railway is dual-single-track road, length 48 km, with 12 tunnels and three stations. Speed up on the railway is 160 km/h. This road connects stations Adler and Krasnaya Polyana
4 Railway Model: Setting configuration of railway Communicating configuration of railway (UDP broadcast) Displaying stations, semaphores, switches Determining position of trains Changing state of semaphores Changing state of switches Changing number of trains Configuration file (XML format) Railway
5 Requirements: Identification position of trains Initialization of trains Input/Output system Dublication system Dynamic update Logging system Sensors, semaphores, switches system Self-Test system Security system GUI Recovery mode
6 Decomposition #что у нас есть? #ЖД # #(защита дублирование) #с-ма мониторингас-ма контроля аварийная с-ма # логипозицияоборудование самотестирование # восстановление # Semaphores Switches Self-test Logs Dispatcher Train Double fitments Positioning controller GUI Electrical supply failure Railway sectionAlarm status
7 THANKS YOU GUYS!
Еще похожие презентации в нашем архиве:
© 2024 MyShared Inc.
All rights reserved.