1 Some points on RAW management in the Exclusion Zone
2 Disposal point for radioactive waste Buryakivka (aerial picture)
3 Facilities location at the disposal point Buryakivka Умовні позначення: - заповнена траншея - траншея, вкрита захисним глиняним екраном - законсервована траншея
4 Schematic plan of trench for disposal Buryakivka
5 Entrance point for solid radwaste control
6 Location plan of new and existing trenches and other equipment at DPRW "Buryakivka"
7 Location plan of trenches at DPRW "Buryakivka" after its reconstruction
8 Cross-section of a modified plan of new trenches considering the existing trenches dimensions
9 Space shot of DPRW "Pidlisny"
10 Modules A-1 and B-1 filled with radioactive waste
11 Modules A-1 and B-1 of DPRW "Pidlisny" after reconstruction
12 Design of DPRW
13 Storage cross-section
14 Points of temporary location of RAW
15 a pile with radioactive waste
16 Trench 1 PTLRW Tankfarm"
17 Trenches and piles at PTLRW Tankfarm The area of the trenches, flooded during the spring, is marked on the map. Участо к 2.1 ПВЛРО «Старая стройбаза» Участок 2.4 Участки ПВЛРО затопленные в паводок 1999 г. Припятский затон Т- 039 Т- 190 Траншеи ПВЛРО «Нефтебаза» ПВЛРО «Песчаное плато» ПВЛРО «Припять» ПВЛРО «Станция Янов» Участок 3.1 ПВЛРО «Рыжий лес» Участок 2.6 Участо к 2.3 Участо к 2.5 Участо к 2.2
18 1. Pile 4 before liquidation 2. Site after liquidation of the pile
19 General information on RAW storages in the Exclusion Zone as of Name, of storage Design capacity, м 3 Description of storages contents Exploitation schedule Fulfillment, thous. м 3 Total number of RAW, thous. т Total activity of RAW, Bq Buryakivka DPRW Buryakivka ,691330,542,53E+15 RAW acceptance "Pidlisny" DPRW "Pidlisny" (for modules. А-1, B-1) 3,96 7,9 2,59E+15 RAW preservation DPRW NPP 3 rd Turn"no design 26,241,93,24E+14 RAW preservation Total on DPRW: 690,851380,365,44E+15
20 PTLRWNew Construction Base" no design28,3542,517,32E+12RAW storage PTLRWOld Construction Base" no design40,1562,633,85E+13RAW storage PTLRWTankfarm" no design101,46179,343,31E+13RAW storage PTLRWChystohalivka" no design0,8741,317,80E+10RAW storage PTLRWYaniv Station" no design30,015,03,70E+13RAW storage PTLRWKopachi" no design110,090,03,33E+13RAW storage PTLRWRed Forest" no design500,0250,03,74E+14RAW storage PTLRWSandy Plateau" no design57,2991,535,69E+12RAW storage PTLRW "Pripyat" no design16,011,02,59E+13RAW storage Total on PTLRW: 884,12743,335,55E+14 Together on DPRW and PTLRW:1 574, ,696,00E+15 Name, of storage Design capacity, м 3 Description of storages contents Exploitation schedule Fulfillment, thous. м 3 Total number of RAW, thous. т Total activity of RAW, Bq