Some points on RAW management in the Exclusion Zone.

Презентация:



Advertisements
Похожие презентации
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
Advertisements

Designing Enterprise Edge Connectivity © 2004 Cisco Systems, Inc. All rights reserved. Designing the Remote Access Module ARCH v
© 2006 Cisco Systems, Inc. All rights reserved. HIPS v Configuring Groups and Policies Managing Hosts and Deploying Software Updates.
1 Анна Юфкина Специалист по бизнес-решениям
S5-1 PAT328, Section 5, September 2004 Copyright 2004 MSC.Software Corporation SECTION 5 RESULTS TITLE EDITOR.
1 - 1 Accounting role as element of a control system of any organization Soniev Jamoliddin.
107113, г.Москва, Cокольническая площадь, д.4А Тел./факс: +7 (495) ОТС 2012 conference.
BUSINESS LETTER TRUE OR FALSE TEST. Are the following statements True or False? TRUE FALSE.
Образец заголовка Образец текста Второй уровень Третий уровень Четвертый уровень Пятый уровень 1 Investment Attractiveness Index with the support of the.
N.Topilin, JINR The engineering equipment and systems for NICA International Workshop NICA-SPIN 2013 JINR, Dubna, Russia, March , 2013.
WS3-1 WORKSHOP 3 RESULTS TITLE EDITOR PAT328, Workshop 3, September 2004 Copyright 2004 MSC.Software Corporation.
Chapter 1: Introduction 1-1 Copyright © 1998, Cisco Systems, Inc. Section 1.
© 2006 Cisco Systems, Inc. All rights reserved. CIPT1 v Administration of Cisco Unified CallManager Release 5.0 Performing General Administration.
© 2006 Cisco Systems, Inc. All rights reserved. BSCI v Configuring OSPF Configuring OSPF Special Area Types.
Lecture # Computer Architecture Computer Architecture = ISA + MO ISA stands for instruction set architecture is a logical view of computer system.
General Packet Radio Service. GPRS GPRS is a packet-based data bearer service for GSM and TDMA networks. GPRS gives mobile users faster data speeds and.
Образец заголовка Образец текста Второй уровень Третий уровень Четвертый уровень Пятый уровень 1 Investment Attractiveness Index with the support of the.
KARAGANDA STATE MEDICAL UNIVERSITY Department: Epidemiology and communal hygiene Topic: The basic principles and methods of protection of the population.
Logistic Management of investment-construction project TRANSMARKET GROUP.
11 The legal framework on the disposal of intermediate level waste in Russian Federation Scientific and Engineering centre for Nuclear and.
Транксрипт:

Some points on RAW management in the Exclusion Zone

Disposal point for radioactive waste Buryakivka (aerial picture)

Facilities location at the disposal point Buryakivka Умовні позначення: - заповнена траншея - траншея, вкрита захисним глиняним екраном - законсервована траншея

Schematic plan of trench for disposal Buryakivka

Entrance point for solid radwaste control

Location plan of new and existing trenches and other equipment at DPRW "Buryakivka"

Location plan of trenches at DPRW "Buryakivka" after its reconstruction

Cross-section of a modified plan of new trenches considering the existing trenches dimensions

Space shot of DPRW "Pidlisny"

Modules A-1 and B-1 filled with radioactive waste

Modules A-1 and B-1 of DPRW "Pidlisny" after reconstruction

Design of DPRW

Storage cross-section

Points of temporary location of RAW

a pile with radioactive waste

Trench 1 PTLRW Tankfarm"

Trenches and piles at PTLRW Tankfarm The area of the trenches, flooded during the spring, is marked on the map. Участо к 2.1 ПВЛРО «Старая стройбаза» Участок 2.4 Участки ПВЛРО затопленные в паводок 1999 г. Припятский затон Т- 039 Т- 190 Траншеи ПВЛРО «Нефтебаза» ПВЛРО «Песчаное плато» ПВЛРО «Припять» ПВЛРО «Станция Янов» Участок 3.1 ПВЛРО «Рыжий лес» Участок 2.6 Участо к 2.3 Участо к 2.5 Участо к 2.2

1. Pile 4 before liquidation 2. Site after liquidation of the pile

General information on RAW storages in the Exclusion Zone as of Name, of storage Design capacity, м 3 Description of storages contents Exploitation schedule Fulfillment, thous. м 3 Total number of RAW, thous. т Total activity of RAW, Bq Buryakivka DPRW Buryakivka ,691330,542,53E+15 RAW acceptance "Pidlisny" DPRW "Pidlisny" (for modules. А-1, B-1) 3,96 7,9 2,59E+15 RAW preservation DPRW NPP 3 rd Turn"no design 26,241,93,24E+14 RAW preservation Total on DPRW: 690,851380,365,44E+15

PTLRWNew Construction Base" no design28,3542,517,32E+12RAW storage PTLRWOld Construction Base" no design40,1562,633,85E+13RAW storage PTLRWTankfarm" no design101,46179,343,31E+13RAW storage PTLRWChystohalivka" no design0,8741,317,80E+10RAW storage PTLRWYaniv Station" no design30,015,03,70E+13RAW storage PTLRWKopachi" no design110,090,03,33E+13RAW storage PTLRWRed Forest" no design500,0250,03,74E+14RAW storage PTLRWSandy Plateau" no design57,2991,535,69E+12RAW storage PTLRW "Pripyat" no design16,011,02,59E+13RAW storage Total on PTLRW: 884,12743,335,55E+14 Together on DPRW and PTLRW:1 574, ,696,00E+15 Name, of storage Design capacity, м 3 Description of storages contents Exploitation schedule Fulfillment, thous. м 3 Total number of RAW, thous. т Total activity of RAW, Bq