M.E.Stavsky Vice President OJSC NK Rosneft Moscow Carbon Market Forum 2008 April 28-29 Rosneft Experience in Preparing Joint Implementation Projects: Constraints.

Презентация:



Advertisements
Похожие презентации
By Shalnev Dmitry Class 9 A Pervomaisk Secondary School Tambov Region 2014.
Advertisements

EU TACIS PROJECT Support and Development of Renewable Sources of Energy (Biomass) Objective Promote the use of biomass in Ukraine Veli-Pekka Heiskanen,
Federal State Educational Institution of Higher Professional Education "Moscow State Construction University" MASTER'S DISSERTATION THEME: Improving methodological.
Students: Veselkova DA 4th year student NIU "MGSU-IISS" IGES Galkin MV 4th year student NIU "MGSU-IISS" ISA Scientific adviser: Ph.D., Associate Professor.
Definition of units in the statistical register of Rosstat Deputy Head of Department Elena Zarubina.
RUSSIAN NATIONAL SYSTEM FOR THE ESTIMATION OF ANTHROPOGENIC GHG EMISSIONS BY SOURSES AND REMOVALS BY SINKS, AS A TOOL OF IMPLEMENTATION OF RUSSIAN OBLIGATIONS.
Russia renders a great influence on ecological conditions and development in Europe and on the planet. On its territory there are more than 20 % of world's.
Optimal market access framework for taxi services to become a genuine part of the collective passenger transport chain: reforming the Russian taxi market.
Labour force – million CHINAS LABOUR FORCE Total – million Unemployment Rate – 4.3 % ( 39 worldwide ) Including migrants – up to 9 % For.
Strategy Project operator * Sakhalin Energy Investment Company Ltd. (Sakhalin Energy) is the Sakhalin II project operator. * The Sakhalin Energy shareholders.
The market of perfumery and cosmetics is considered one of the fastest growing in the world. The annual growth rate of the market in Russia is 20%, outpacing.
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
Designing Network Management Services © 2004 Cisco Systems, Inc. All rights reserved. Designing the Network Management Architecture ARCH v
Labour Migration Flows from Kyrgyzstan to Russia: States´ Cooperation in Migration Policy Cholpon KEMELOVA, The Academy of Public Administration Bishkek,
Vladislav Lutskov General Director MIEL Analytic Consulting Centre (MIEL ACC) September 2008 Moscow Russian Real Estate Market Overview THE FINE ART OF.
Introducing Cisco Network Service Architectures © 2004 Cisco Systems, Inc. All rights reserved. Introducing the Cisco AVVID Framework ARCH v
Accounts Chamber of the Russian Federation Global imbalances analysis: implications for KNI selection Anton Kosyanenko.
United Kingdom environmental law. Vocabulary Concerns - касаться Increasingly – все больше и больше Waste – отходы Industrial emissions – промышленные.
Designing Virtual Private Networks © 2004 Cisco Systems, Inc. All rights reserved. Designing Remote- Access VPNs ARCH v
About National Ecological Centre of Ukraine National Ecological Centre of Ukraine (NECU) is a non-governmental not-for-profit organization created in.
Транксрипт:

M.E.Stavsky Vice President OJSC NK Rosneft Moscow Carbon Market Forum 2008 April Rosneft Experience in Preparing Joint Implementation Projects: Constraints and Prospects

2 Associated Petroleum Gas (APG) Production and Utilization in Russia APG Resource Distribution 1 in Russia: 2007 Oil and Condensate Production Growth in Russia 1 APG resources: amount of associated gas extracted together with oil APG flaring is largely underestimated due to the absence of reliable production and recovery measurements Рост в 1,6 раза Рост в 2,4 раза APG Production Growth in Russia Source: Fuel and Energy Sector Central Dispatch Department MMT Oil Production bcm APG Production (Recovery and Flaring) 16.8 bcm (28%) 44.2 bcm (72%) Recovered Flared

3 APG Utilization Issues in Russia Key APG utilization issues: Absence of additional gas processing capacities in some oil producing regions; Restricted access to Gazproms Unified Gas Transmission System; Large distances between certain fields and regional gas processing and transport centers; A relatively narrow range of available technologies and technical solutions; Low APG prices in oil producing regions. Projects to develop gas collection, transport and processing infrastructure are not cost effective for non-Gazprom gas producers Maintaining status quo means: Atmosphere pollution by growing GHG emissions; Suboptimal use of natural resources.

4 Rosneft APG Utilization Program APG Utilization Rate in RosneftAPG Utilization Options and Methods Rosneft activities to enhance APG utilization: Increasing APG utilization rate in existing fields; Maximizing APG utilization rate in new fields (Vankorskoye, Yurubcheno-Tokhomskoye); Looking for new technical solutions and APG utilization technologies bcm Supply to GPP Supply to Gazprom Supply to other users Own consumption and power generation Flaring %

5 APG Recovery Project in Komsomolskoye Oilfield Project scope: Construction of a 2 bcm booster compressor station (BCS); Construction of an external gas pipeline. Utilization of Komsomolskoye APG Resources BCS put into operation Project objectives: Utilization (treatment and supply to Gazprom trunk gas pipeline) over 2 bcm of APG by 2010; Addressing the APG utilization issue; Reduction of GHG emissions into the atmosphere. Urengoi-Chelyabinsk trunk gas pipeline BCS with a gas conditioning unit Komsomolskoye oilfield Gubkinsky GPP External gas pipeline Current supply arrangements New supply arrangements bcm APG productionAPG flaring

6 Improving Project Economy Based on the Kyoto Protocol Mechanisms Comparative Economic Indicators of the JI Project in Komsomolskoye Oilfield: A Joint Implementation (JI) project under the Kyoto Protocol: A set of activities to reduce GHG emissions, with emission reduction unit (ERU) sale options to generate additional income; The ERU sale facility allows increasing the projects Internal Rate of Return; The Kyoto Protocol offers a mechanism to reduce economic barriers to GHG emission reduction projects Internal Rate of Return (IRR), % Discounted Payback Period (DPP, 10%), years Without ERU sale optionWith ERU sale option

7 Key JI Project Design and Preparation Stages Analysis of possible technical solutions for gas utilization, and selection of the most cost effective option; Analysis of applicability of the Kyoto Protocol mechanisms with a view to improving project performance; Analysis of project compliance with JI criteria, and selection of a methodology for estimating the GHG emission reduction level; Preparation of technical design documents (TDD); TDD: a preliminary independent review, publication for comments, and the final review. Parallel stages: State Environmental Review of the project; ERU sale negotiations; Document preparation for project review at the national level.

8 Methodology for Estimating the GHG Emission Reduction Level Selecting of the project baseline scenario: estimating CO 2 emissions from APG flaring; Estimating emission level under the JI project; Calculating Emission Reduction Units for further sales СО2 emissions, thousand tons Emission Reduction Units Project implementation year Baseline scenario emission level

9 Scope of Technical Design Documents Mandatory elements of technical design documents: A.General description of project scope/activities; B.Use of the baseline scenario selection methodology and additionality assessment; C.Project lifetime / ERU generation period; D.Use of the monitoring methodology and plan; E.GHG emission assessment by source, and emission reduction estimates; F.Project environmental impact assessment; G.Stakeholder comments. Specific elements of the national package: H.Description of project risks.

10 NK Rosneft –World Bank Partnership The Banks experts made 3 visits to the oilfield: in July and October 2007, and in March The oilfield was also visited by experts from EcoSecurities (an international consulting firm responsible for the TDD Environmental Monitoring Section) and DNV Certification (a company that evaluated GNL project compliance at the final review stage). World Bank and DNV Certification experts visit LLC RN-Purneftegaz, the Komsomolskoye oilfield operator The World Bank is a partner to Rosneft as regards implementation of the Kyoto Protocol mechanisms in Russias oil industry.

11 JI Project Constraints Key methodological constraints: There is no methodology to assess GHG emission reduction for a number of technical solutions providing for APG utilization (injection into the oil reservoir, underground gas storage facilities) –Potential APG recovery by NK Rosneft under such projects is estimated at not less than 1 bcm per year; TDD preparation involves much labor input and relatively high costs, and therefore JI projects are not cost effective for small oilfields –Potential APG recovery by NK Rosneft under such projects is estimated, in the aggregate, at not less than 0.5 bcm per year; There is no practical experience in using available methodologies in the Russian context. National-level constraints: There is no practical experience in JI project review and approval by authorized public bodies; The regulatory legal framework governing relations arising from JI project preparation and implementation needs further elaboration and improvement; It is necessary to specify JI mechanisms in terms of hydrocarbon field licensing and operation.

12 Prospects for JI Use in Russia Additional investment in the Russian economy to address the GHG emission reduction issue: up to 3 billion Euros in ; Encouraging transition to more stringent environmental protection standards; Creation of new jobs and tax revenue growth; Encouraging new technology development; Releasing oil companies investment resources for enhanced raw material base reproduction; Rational use of available natural gas resources.

13 Additional slides

14 JI Project Preparation in Komsomolskoye Oilfield: Actual Work Schedule rd Q.4 th Q.1 st Q.2 nd Q.3 rd Q.4 th Q.1 st Q.2 nd Q.3 rd Q. Analysis of possible technical solutions for gas utilization, and selection of the most cost effective option; Search for and selection of the Partner to consider the use of the Kyoto Protocol mechanisms Analysis of project compliance with JI criteria, and methodology selection Project assessment using the JI mechanism Signature of the Letter of Intent with the Partner Selection of the company to prepare technical design documents (TDD). TDD preparation TDD predetermination and publication for comments TDD final determination Preparation of design documents and cost estimates for the technical project; state review; and approvals Bidding for equipment supply Negotiations on Emission Reduction Unit Sales Document package preparation and application submission for project review at the national level