Initial Capacity Assessment Sheet (ICAS) & Capacity Assessment Sheet (CAS) Communication kit for suppliers. Updated: 8 Dec 2010 for revision 01.

Презентация:



Advertisements
Похожие презентации
Influence of video’s sound quality on its positions in YouTube search results - SeeZisLab
Advertisements

Introduction to ISO9001:2008 Have a quality manual – the system framework Create documents including a quality policy, core processes, objectives, procedures,
Electronic TRIAL MASTER FILETAILORED FOR YOU. MANAGE HIGH VOLUME OF DOCUMENTS Online file sharing & versioning Automatic capture of Metadata Quality Control.
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
Time Management - a technology organization of time and increase the efficiency of its use. It is a lifestyle that allows you to comfortably manage a.
According to the reporters research, the logistics industry is currently facing some problems such as capacity, infrastructure, security, rising truck.
The waterfall model is a popular version of the systems development life cycle model for software engineering. Often considered the classic approach to.
The only way to dial. STAR PHONE – The only way to Dial "Hello and thank you for calling us... For management dial one ….For accounting department dial.
Influence of property optimization of the uploaded file on its positions in Youtube search results - SeeZisLab
Loader Design Options Linkage Editors Dynamic Linking Bootstrap Loaders.
Escalating TAC Service Request © 2004 Cisco Systems, Inc. All rights reserved. IPTT v TAC Service Request and Telephone Service Providers.
Bubble Sort. Bubble Sort Example 9, 6, 2, 12, 11, 9, 3, 7 6, 9, 2, 12, 11, 9, 3, 7 6, 2, 9, 12, 11, 9, 3, 7 6, 2, 9, 11, 12, 9, 3, 7 6, 2, 9, 11, 9, 12,
By Savruyeva Alima. Study schedule strategy That Actually Works!
The waterfall model is a popular version of the systems development life cycle model for software engineering. Often considered the classic approach to.
Introducing Cisco Network Service Architectures © 2004 Cisco Systems, Inc. All rights reserved. Introducing the Network Design Methodology ARCH v
USAGE OF CREDIT CARD How to write a report?. Usage of Credit Card The 'Title' should explicitly tell the reader what the report is about. Table of Consents.
© 2002 Systex Services1 ISO 9000:2000 OUTLINE Quality Management System.
© 2006 Cisco Systems, Inc. All rights reserved.BCMSN v Defining VLANs Correcting Common VLAN Configuration Errors.
Time-Series Analysis and Forecasting – Part IV To read at home.
FUP Framfab Unified Process Strategic Level Project Level A client team works cross-projects and analyzes the clients situation and develops the clients.
Транксрипт:

Initial Capacity Assessment Sheet (ICAS) & Capacity Assessment Sheet (CAS) Communication kit for suppliers. Updated: 8 Dec 2010 for revision 01

Volvo 3P / VPT Supplier Quality Department. 2 Purpose of the Initial Capacity Assessment Sheet (ICAS) & Capacity Assessment Sheet (CAS) Purpose of the Initial Capacity Assessment Sheet (ICAS) & Capacity Assessment Sheet (CAS) The ICAS and CAS is used to verify and assure that the supplier's production system will be able to produce required customer declared volume stated in the RFQ. Capacity is to be demonstrated in all production steps. One ICAS/CAS is used for every part number.

Volvo 3P / VPT Supplier Quality Department. 3 ICAS/CAS – a part of the APQP. APQP-reviewsToolGDP-milestones Kick off meetingICAS Product designICAS Process designICAS Industrialization reviewICAS/CASPPG (SPR) (PPAP) Launch reviewCASRG ICAS: In the first stages of the project/APQP a shorter version of the Capacity Assessment Sheet (CAS) is used, the Initial Capacity Assessment Sheet (ICAS). The ICAS is a self- assessment to be submitted to Volvo to verify that the supplier has a realistic capacity planning in place for the partnumber in question. CAS: In the later stages of the project/APQP for the PPG and RG the full Capacity Assessment Sheet (CAS) is used. The CAS is the tool for documenting the SPR and at the supplier site. It can be used either as a self-assessment by the supplier or a live audit tool by Volvo representatives.

Volvo 3P / VPT Supplier Quality Department. 4 Initial Capacity Assessment Sheet (ICAS) The purpose of the ICAS is to verify that the supplier has a realistic capacity planning in place for how to produce the required customer volume. The ICAS is a self-assessment used by the supplier and then submitted to and approved by Volvo. The ICAS consists only of 2 sections: 1. Key Information 2. Capacity Planning One ICAS-file per partnumber is issued/used.

Volvo 3P / VPT Supplier Quality Department. 5 Initial Capacity Assessment Sheet (ICAS) 1.Filling in the file: The ICAS file has a second sheet named ICAS user guide. Please fill in the sections 1. Key Information. and 2. Capacity Planning according to the user guide. Fill in volume quoted in RFQ in cell Annual quoted volume (RFQ) in section 1. Key Information. Volume value that should be used is volume in peak production year multiplied with 10% for fluctuations during the year. 2.Analyzing the result: In the attached example the row M – Planned Ideal Cycle Time is red/NOK for 2 of the assessed processes. (This is because the Planned Ideal Cycle Time is higher than the Required Cycle Time needed to cover the weekly customer demand). For the rest of the processes the result is green/OK. Actions by the supplier will be needed in these two red/NOK processes to get a totally green/OK result for the whole ICAS.

Volvo 3P / VPT Supplier Quality Department. 6 Initial Capacity Assessment Sheet (ICAS) 3. Examples of actions to make the red/NOK processes green and OK: a)Supplier to implement actions to Decrease the Planned Ideal Cycle Time below the level of the Required Cycle Time needed to cover the weekly customer demand. b)Supplier to dedicate more time to this part number in the assessed process by increasing the A / B / B1 - Hours/shift used for this part number. c)Supplier to implement actions to reduce the planned/unplanned downtime (maintenance, breaks, setup, inspections, breakdown etc) in the assessed process. d)Supplier to implement actions to increase L - Projected Quality Rate (%) 4. Final expected result: A totally green/OK ICAS = All production processes concerned has a capacity planning that is realistic and that will be able to produce the required/declared weekly customer volume for the concerned part number.

Volvo 3P / VPT Supplier Quality Department. 7 Capacity Assessment Sheet (CAS) The CAS is the tool for documenting the SPR and at the supplier site. The CAS can be used either as a self- assessment by the supplier or a live audit tool by Volvo representatives. The CAS consists of 7 sections: 1. Key Information 2. Capacity Planning 3. Production Run 4. Capacity Calculation 5. Overall Equipment Effectiveness (OEE) 6. Manufacturing Bottleneck 7. Supplier Operation Management Approval. One ICAS-file is used per part number.

Volvo 3P / VPT Supplier Quality Department. 8 Capacity Assessment Sheet (CAS) 1.Filling in the file: The CAS file has a second sheet named CAS user guide. Please use this user guide when filling in the sections 1 to 7 in the CAS. If an already filled in ICAS file exists for this part number, please use that file as a basis for section 1 & 2 in the CAS. Fill in volume quoted in RFQ in cell Annual quoted volume (RFQ) in section 1. Key Information. Volume value that should be used is volume in peak production year multiplied with 10% for fluctuations during the year. Section 3 – Production run should be filled in according to the results/output of the Significant Prod Run (or later An agreement needs to be done with Volvo from case to case regarding if the is required to be done under the supervision of Volvo or can be managed by the supplier themselves

Volvo 3P / VPT Supplier Quality Department. 9 Capacity Assessment Sheet (CAS) 2.Analysing the result: In the attached example the row AA - Percent above/below Customer Demand/Week is red/NOK for one of the assessed processes. (Looking at the result of the this process will not be able to cover the required weekly customer demand.). For the rest of the processes the result is green/OK. Actions by the supplier will be needed in this red/NOK process to get a totally green/OK result for the whole CAS. 3. Final expected result: A totally green/OK CAS = All production processes concerned has a capacity planning that is realistic and that has been tested and proven through a Significant Production Run (and later A totally green/OK CAS = The supplier has signed off on the offered capacity, manufacturing processes and intended operating pattern to fully produce the required customer volume for the concerned part number (which also satisfies all PPAP requirements).

Volvo 3P / VPT Supplier Quality Department. 10 ICAS – Process flow. In these APQP- phases: 1. Kick off,. 2. Product design. 3. Process design (All 3 steps for every phase) For every part number concerned: 1. RFQ: ICAS template is sent out with RFQ. 2. Supplier: Supplier updates ICAS file with the latest data for the concerned production processes (with attached corrective actions if rejected by Volvo before). 3. ICAS status: Red/NOK or OK (sheet completely filled in and no process step shows lack of capacity). 4. End effect: Supplier has a realistic capacity planning in place to produce the requested Volvo volumes for the concerned part number. OK NOK Next page

Volvo 3P / VPT Supplier Quality Department. 11 CAS – Process flow. In these APQP- phases: 4. Industrialization review. 5. Launch review. (All 4 steps for every phase) For every part number concerned: 5. Depending on the agreement with Volvo the SPR and is performed either under Volvo supervision or under suppliers own supervision. 6. Supplier fills in CAS: Supplier then updates the CAS with the results from the signs off and submits it to Volvo (with corrective action list if necessary). 7. Volvo: Volvo approves or rejects the submitted CAS. 8. End effect: All production processes concerned has a capacity planning for the concerned part number that is realistic and that has been tested and proven through a Significant Production Run (and later 9. Supplier storing: Supplier stores signed off CAS together with PPAP documentation. OK NOK

Volvo 3P / VPT Supplier Quality Department. 12 Conclusion After approval of the Capacity Assessment Sheet (CAS) by Volvo at Significant Production Run / the supplier should continue to use this Capacity Assessment Sheet (CAS) to improve and identify potential capacity issues. The supplier should at all times communicate immediately about any foreseen capacity issues that could prevent meeting forecasted Volvo volumes or flexibility requirements to his Volvo buyer/SQE.